Skip to technology

SEVA FIRST · MAHARASHTRA · 2026

Intelligence for
better bioenergy.

Physics-guided intelligence for biogas plants. Understand the records, explore plant behaviour and make the next decision with clearer evidence.

A farm-first proposal by
Chatake Innoworks Private Limited
Meet the team
PLANT ASSEMBLY / ENGINEERING VIEWSoftware prototype
DIGESTER · SENSORS · PROCESS CONNECTIONSEnlarge ↗

An existing GFIS engineering view. The proposed farm connection is the next field step.

01 / OBSERVE

Make the plant record useful.

02 / UNDERSTAND

Compare models with evidence.

03 / DECIDE

Keep operators in control.

SEVA FIRST / MAHARASHTRA ZONE

Submitted. Ready for the next step.

GFIS Bioenergy Intelligence submitted its company entry on 17 October 2026. A five-member team will prepare the next demonstration, combining an existing software prototype with a proposed farm measurement study.

Portal acknowledgement verified. Assessment and selection remain pending.

Submission & next steps ↗

THE TECHNOLOGY

A traceable path from
observation to decision.

Process records, forecasting and numerical scenarios in one engineering workflow. Select a stage to inspect its inputs and outputs.

Start with a reliable record.

Feed mass, timestamps, safely measured temperature and gas-meter readings enter a versioned record. Units, missing values and calibration status remain visible. The output is a traceable plant history.

Read the measurement protocol ↗

THE ENGINEERING SOFTWARE

Engineering, with
a visible record.

Bring selected project inputs, retained models and numerical scenarios into a revision-based engineering workspace. Inspect what changed, retain the result and verify a replay.

Open Synthesis ↗
Actual software interface · Retained verification capture · Click to inspect
01 / PROJECT INPUTS

Select and inspect.

Import an explicitly approved, bounded file snapshot. Keep source files and the revision visible. Web import is not automatic folder synchronisation.

02 / MODELS & SCENARIOS

Know what produced the number.

Retained LSTM, XGBoost and persistence inference uses historical total-biogas inputs. Synthetic plant scenarios remain separately labelled.

03 / EXPERIMENT MEMORY

Keep the decision record.

Retain checked revisions in an authenticated workspace, inspect calculation dependencies, export a record and replay it with the same engine.

Workspace data requires authorised sign-in. This is engineering software, not autonomous plant control. Screenshot values are not farm observations.

Connected workspace · sign-in required ↗

PROPOSED FARM CONNECTION

  1. Farm observations
  2. Quality review
  3. Synthesis analysis
  4. Operator review
  5. Saved report

The software is deployed. Farm instrumentation, data integration and prospective validation are the next pilot steps—not completed field work.

FIELD CONTEXT / EXISTING INSTALLATION · View photograph ↗

THE FIRST DEMONSTRATION

Start where
the waste is.

An existing small farm biogas installation provides a practical setting for the first proposed measurement and usability study.

Can an operator maintain a useful record, see where observations are missing, and produce a report that explains the plant’s behaviour?

  1. Review safe measurement options.
  2. Establish a daily baseline with the operator.
  3. Evaluate data quality before model performance.
Explore the farm pilot ↗

Proposed pilot. No connected farm trial is claimed.

RESEARCH FOUNDATION

Show the result.
Keep its context.

Retained GFIS experiments and software form the starting point. Each type of evidence supports a different question.

HISTORICAL DATA
500,400

One-minute records

DS-06 contains total-biogas flow from one full-scale facility. The processed set contains 491,761 records.

Dataset and claim boundaries ↗

ROLLING-ORIGIN VALIDATION

Does memory help forecasting?

Persistence16.7470 CFM MAE
LSTM13.9378 CFM MAE

Verified retained run means across three rolling-origin folds, with seeds averaged within each fold. Lower is better. Total biogas at one facility; farm performance remains to be evaluated.

NUMERICAL SCENARIOS

48 hours of
“what happens if?”

Explore nominal operation, temperature disturbance and process stress through retained numerical trajectories.

Synthetic scenarios; the horizon is simulated time. VFA/ALK curves are model responses awaiting laboratory validation.

Open existing simulator ↗

IMPLEMENTATION

One measured step.
Then the next.

A proposed 90-day programme beginning after site approval and resource confirmation.

  1. DAYS 01–07

    Assess

    Condition review, access agreement, record schema and instrument quotes.

  2. DAYS 08–21

    Establish

    Manual baseline and a practical operator walkthrough.

  3. DAYS 22–60

    Observe

    Continue records; introduce approved measurement where feasible.

  4. DAYS 61–90

    Evaluate

    Review quality, feasible baselines and readiness for a second site.

PROVISIONAL PILOT ALLOWANCE

₹31,900

Incremental measurement, installation review, calibration, training and data support. Includes 10% contingency; excludes the existing plant and founder development time. Quotes and the final funding ask remain to be agreed.

Budget breakdown ↗

PROPOSAL LIBRARY

The proposal.
Every detail, in context.

3 documents

Proposed farm-first programme · Field validation pending

THE WIDER GFIS PLATFORM

Explore the engineering
behind the proposal.